One of the most difficult challenges in building the mobile high tunnel is setting the track.The two tracks need to be parallel and on a level plane - one end can be higher or one side, but it needs to be consistent.
And the foundation for any building project is crucial for its success. Ken had set up the track, a string and the transit. Loyal came by and helped. They measured various points along the track.
No comments:
Post a Comment